Monday, September 20, 2010

It's getting there!

Today was bathroom day - again! Paint, toilet, faucets, lights... We have a fully functioning bathroom again!!

complete-ish
It's really just the small stuff now.  Things like trim, cabinet handles, possibly another coat of pain, floor grate (might re-paint the one we have white), some more caulking and cleaning, and she's DONE! I'm not sure what I'll do with the window because the frame of it sticks out too far from the wall. They were built for the thickness of the plaster, and now that there's drywall, there's about a half inch gap between the sill and the wall.  You can kind of make it out in that picture above.

Violet likes... her new hat.

Edit:
Oh, we're also missing the mirror (obviously) -- Marn doesn't want the old one back again.  Or least if she can find another one for not too much money.  That would have been nice to know before painting so that I could have filled in the holes in the wall that held the mirror!
Also, you can't see it, but there's a hole in the wall above the light switch (you may have seen it before).  It's still there because we're not sure (yet) if we want to put in a light above the shower.  We're leaning toward yes.  The hole was put in when we ran new wire to install the fan, so I left it open in case we need it again.  Need to decide on that soon.

Wednesday, September 15, 2010

Bathroom floor

I grouted tonight.... waiting for it to dry before one last wipe before bed.  As I was prepping the floor I noticed something with the mortar in between the tiles that I didn't like.  I hope it's nothing, but I can't help but think that it could be a big problem down the road.  I ended up using two different bags of mortar because I had a bunch left over from previous "jobs".  2 half bags, one was white, and the other grey.  They were both the same "type" (Polymer Modified Mortar), but different brands, which wouldn't matter.  The grey bag was much older than the white mortar.  I think about 2 years, actually, when I did the kitchen floor in the old house, or possibly when I did the back splash.  I didn't think it would be a big deal.  It was never wet, or anything, and it mixed up ok. It trowelled on fine...  but tonight when I was cleaning up the grout lines, the grey mortar was very soft compared to the white.  In some cases it seemed to just fall apart and turn to dust when I scraped it, or if I smashed a little ball of it on the floor.  This should NOT be happening, and it's making me very nervous that all of the grey tiles are going to pop off some months or weeks down the road.  The mortar should be very hard, like cement.
I suppose I should Google mortar and shelf life, but I don't want to see the answer I don't want to hear right now.  Maybe tomorrow, or next week.

This is what it looks like after two wipes.... a few more to go!  But not tonight.

Hopefully everything will be fine, and I won't have to go back and redo it. THAT would SUCK!!  Time will tell....

Sunday, September 12, 2010

Long Awaited Bathroom Pics

Well, this bathroom reno turned into a much larger project than I thought it would.  Anyway, it's not 100% done, but done enough that I can show some pics now.  :)  It will be another few days of doing little things to fully complete it.

Originally I was hoping to just "pop" the tiles off and tile over them for the new shower, but that clearly wasn't going to happen once I took one or two off for "inspection"...


Yah, that's about over an inch of plaster under the tiles.  Ugh!  Not going to be a fun process taking all of that down!  You saw the 2 car loads in a previous post.  About 650 KG of garbage.  After 4 days of demolition, this is what we had to work with;


The remaining plaster was taken down, plumbing moved to the left side wall, the new tub put in place, and cement boards fastened and dry wall up on the other walls!


Next was to start tiling the shower.  Here's the progress and finished product:


The colour isn't right in this picture because I couldn't get the flash working on the camera - I tried to edit the pic, but it didn't come out so great.



Once that was done and grouted, we could start using our shower again -- About 2.5 weeks without it was a bit of a challenge!
After a lot of dry wall patching, mudding, taping, sanding, etc.  I primed the walls, painted the cabinets (because we're reusing them) and the granite counter was installed.  Looks sweet!  We also have new knobs for the vanity, but I don't have them installed yet.  I also want to fill in the "decorative lines" in the middle panel below the sink, but didn't have the time, or stuff to do that.



So, we're feeling pretty good about the state that the bathroom is in at this point. Install some faucets, paint, mirror, toilet and it's ready to go! Except the floors, of course! That was next.
First the substrate layer, 1/2 inch plywood, screwed down a ton. Yes, it does need that many screws!


Next the floor tiles! Done just this afternoon, so not cleaned, or grouted just yet. Tomorrow, hopefully that will get done, and won't take very long.  They look like they have a blue hue to them... they're supposed to be black.  We think they still look good, but wished they were a little darker.  It's really more noticeable next to the black granite counter top.


So, after MANY days, 6 weeks, to be exact (!) we're very close to finishing this "small" project... Yeah, it turned out a lot bigger than we expected, but isn't that always the way? The only thing that's hanging over my head at this point is the toilet's "closet flange" (the part that attaches the toilet to the floor and drain. I'm not sure how that's going to go because the drain pipe is not in the best shape, so we may need to call in a plumber to replace some old pipe.

Here are some before shots:



Quite a change, eh?
I'll get some more pics when it's all done and cleaned up.

Thursday, September 09, 2010

Bathroom counter

The new granite counter should be getting installed as I type (Actually, just got a phone call, he's not there yet... should have been there at 12 noon)
I primed the walls on Tuesday night but didn't get to painting them because the prime really lets you see spots that need more attention - there are a few.  So I painted the cabinets white last night as I figured it'd probably be easier to do when the counter wasn't there.  They look new again, with really old crappy handles, which we'll be replacing at some point.

We don't really know which black they ended up getting - we picked a nearly pure black counter, and then as a backup, a black with a little more white flecks in case they couldn't get the other in time.  He called last night and said that it's ready to go, but didn't say which one he got in?  I didn't think to ask.

So after today, I just need to touch up and then paint the walls, and install the floors and toilet, and we're done!
Well, hopefully it'll get installed today...