It looks great! I love the white cedar deck boards. Any trouble we had to get them is totally worth it -- and our neighbour had to "thank" me today for using it because now his wife wants the same for theirs!
DAY 1:
All day Saturday was spent putting together the main structure of it and griping about the post hole digger and the weather. The post holes were too high off the ground so we had to re-think the plans a little bit because of that, and now we are slightly over the 24" mark that we wanted to be (to avoid having to get a building permit). Hopefully it won't be a problem when the inspector comes around in a few weeks to check on the deck behind us... And it rained on and off all day, was super windy (my BBQ blew over), and was really really cold (I'm talking 5-10 degrees!!)
Anyway, this is what we started with; A few stakes in the ground to match a drawing from the other post to beams and joists, finishing the day with the basic shape of our deck...

Chris "supervising"...

The deck Framed...

Marn and I imagining it being warmer and laying on the finished deck -- getting closer!

It was a long, wet and cold day. I didn't think Dad was going to make it back for "Day 2", the way he was limping around when we left here!
DAY 2:
I didn't think it was possible, but Sunday was colder than Saturday. Brutal!
The day was pretty much spent cutting, placing and screwing down the deck boards. It's amazing how long it took, but after I thought about it, there wasn't one board that DIDN'T need to be measured and cut on both ends. Even though we had lots of help, it took a long time!

Chris and Dave also started on the post holes for the privacy fence along the side of our neighbours house. We initially hired the same post hole digger to do the fence boards at the same time as the deck posts, but they were too close to the neighbours gas line (4 feet) for the auger that day and were told that we had to have them hand dug. After the screw-up on the deck posts, we decided to rent a post-hole digger from Home Depot to do the 4 holes needed for the fence. We all expected it to be a major pain to dig them, but to be honest, it was quite easy to do! The tool only cost $10/day, and Dave and Chris had 3 of them dug 3.5 feet down in less than 1 hour before lunch break. Totally worth it! I might do the rest of them if we finish the rest of the fence this summer with this digger.... totally worth it.
Anyway, once we got in a groove with Dad on his new sliding compound mitre saw (first use this weekend), the deck boards were on and looking great!
Dave and I screwing the boards down. I think shortly after this picture, I knocked the beer down christening the deck before it was even "opened".

Anyway, here it looked (and still looks) after day 2:

Other angles:


Marnie and I a little more comfortable on an actual deck!

Of course when our Friends Carey and Chris are over, it calls for big meals... well I had to take a picture of the BBQ that night because the grill was completely full and it was delicious (Carey's sister and boyfriend were over as well). We need a bigger BBQ to accommodate deck parties!

DAY 3:
I set the fence posts in the holes on Monday with Dave, but we didn't do much more than that. I took a vacation day on Tuesday and need to finish one more post after buying a few more pieces of wood then finish screwing down the deck boards because we started running out about 3/4 the way done on Sunday.... and I might get to the stair stringers, but they could be a little more complicated than I had bargained for.
We still have benches and railings to go as well, so even though it looks nearly done, there's a lot left to do! We also decided to create some big flower beds with the extra dirt from the post holes. Marnie has the week off this week, so maybe I'll get on her to start that out. Anyway, we are going to have a busy and fun and expensive summer, and we're not even going on vacation!